COMMISSION CASE STUDY•2024

Symphony of Lights Waterfront Arena

CLIENT
Department of Economy and Tourism (DET)
LOCATION
Dubai Festival City Waterfront
TIMEFRAME
2024
DISCIPLINE
Live Concerts & Music Festivals
PHASE 01 // MANDATE

THE BRIEF

Produce a 30-day nightly musical, laser, and water projection extravaganza celebrating the Dubai Shopping Festival with 200,000 nightly promenade visitors.

PHASE 02 // ENGINEERING

OUR APPROACH

Positioned 24 high-powered 40W RGB lasers on skyscraper rooftops synchronized via GPS timecode with 12 water-screen projectors and an offshore 40-tonne floating concert stage.

Symphony of Lights Waterfront Arena
PHASE 03 // LIVE EXECUTION

THE EXPERIENCE

Audiences were treated to a 360-degree sonic and visual spectacle that illuminated the entire bay, synchronizing orchestral crescendos with dynamic laser geometry and towering water jets.

PHASE 04 // IMPACT

THE RESULTS & ACCOLADES

Delivered 60 consecutive live shows with 100% operational uptime and zero safety issues under rigorous waterfront marine conditions.

200,000 Nightly Promenade Spectators
60 Flawless Consecutive Shows
24 Skyscraper Laser Rigs
Zero Marine Safety Incidents
DEPLOYMENT ARCHIVE
Symphony of Lights Waterfront Arena gallery 1
Symphony of Lights Waterfront Arena gallery 2
SERVICES DELIVERED
Floating Concert Barge Stage Structure
24x 40W High-Intensity Architectural Lasers
Water Screen Projection Mapping
Long-Throw Marine Audio Array System
Automated GPS Timecode Synchronization
COMMISSION SIMILAR ARCHITECTURE

Have an upcoming sports tournament, corporate summit, or VIP hospitality requirement?

DISCUSS A SIMILAR PROJECTStart Your Project
COMMISSION YOUR PRODUCTION // 2026-2027 CALENDAR

LET'S BUILD
YOUR NEXT
BIG MOMENT.

Whether you require a full turnkey tournament village, a 60-metre curved LED plenary stage, or an intimate royal desert pavilion, our technical directors are ready to mobilize.